.. roadmap: Roadmap ============ .. note:: This document acts as an starting point to document a assumed roadmap for the Opener stack. It is work in progress and first collects some ideas. It is proposed to start buttom-up. That means we want to start from driver and go up the stack to layer 2 including scheduler, control with its processes like beaconing/beacon-scan, mac encoding/decoding and more processes. On top of that the DLC and CVG needs to be implemented. :: * Proposals |\ | * dectnrp_driver_api | * dectnrp_nrf91x1 | * Samples using dectnr_driver |/ * Milestone 1 - Support for nRF91x1 and basic rssi1, rx and tx operations <--- Current status |\ | * Basic dectnrp L2 implementation - implement net and kconfig interfaces | * Integration of dectnrp L2 into net-framework, startup works | * Simple scheduler for simple tx and rx without synchronization | * Transparent MAC - without encoding/decoding | * Raw net socket for simple tx and rx of pre-encoded messages | * First implementation of control module - dectnrp_ctrl | * First implementation of managment API - dectnrp_mgmt | * First implementation of shell - dectnrp_shell |/ * Milestone 2 - Basic structure of the stack and simple rx/tx in place |\ | * Encoding/decoding for basic IEs like beacons and association IEs | * Add encoding/decoding interface to be used in dectnrp_ctrl |/ |\ | * Channel selectable via dectnrp_mgmt, fixed band 1 |/ |\ | * FT and PT separation - selectable at build time | * supports beacon sending (FT) with configurable period (run-time option). | * supports beacon synchronization (PT) to beacons received on pre-defined channel. | * Scheduler synchronizes to sent/received beacons |/ |\ | * Association process |/ * Milestone 3 - Simple FT/PT functionality of beaconing, synchronization and association |\ | * Transparent Userflow messages |/ |\ | * Rssi1 scan and auto channel selection |/ . . . * MAC IE multiplexing and assembly (concept first) * Resource and channel management (concept first) * More complex scheduler algorithms (concept first) * HARQ operation * DLC IEs - encoding/decoding * DLC Service 0 * DLC Service 1..3 * Security Procedures * Power control * CVG IEs - encoding/decoding * CVG Service 0..4 * CVG Endpoint management/multiplexing . . .